Here is the before, during and after pictures of the downstairs bathroom reno. It was very difficult for me to do as I can not do very much work at a time. The tile floor took me over 5 days to complete. That should have been no more than 1 day to lay the tile and a few hours the next days to grout.
The old, leaky, mildewy bathroom.
Removing the storage cabinets above the washer/dryer.
Toilet removed. Good riddance as it was problematic.
The TOO LARGE vanity removed.
The shower stall. Newly tiled and new 'anti-scald' tap/showerhead.
No comments:
Post a Comment