Tuesday, March 22, 2011

New Bathroom

Here is the before, during and after pictures of the downstairs bathroom reno. It was very difficult for me to do as I can not do very much work at a time. The tile floor took me over 5 days to complete. That should have been no more than 1 day to lay the tile and a few hours the next days to grout.

The old, leaky, mildewy bathroom.

Removing the storage cabinets above the washer/dryer.

Toilet removed. Good riddance as it was problematic.

The TOO LARGE vanity removed.

Bye Bye door.

The shower stall. Newly tiled and new 'anti-scald' tap/showerhead.

New 6 litre flush toilet and shower entrance trim.

The new vanity. Much smaller and better suited to the room.