Reno Update: B&B Room #1 is finishing up fast. A lot faster than the pool table room (much smaller size and standard height ceiling). All the drywall repairs are done and walls are ready to paint. The California Knockdown ceiling texture is up in the walk-in closet. Next is to texture the main room. Then prime/paint and new flooring. Lastly to finish up with the new doors. The flooring and doors are on order and should be here this week. Hopefully next weekend will see paint and a start on the flooring.
Drop sheets to protect the walls from ceiling texture.